SG Ground Truth

task template resync empties

Re-sync to T: a numeric 0 on T's task overwrites (est, duration); milestone false and "" (stored null) keep the Task's value; a Task with only start or only due keeps its null duration.

API

Q Probe 102 found that writing an entity's task_template to T overwrites a linked Task's field when T's task holds a value and keeps it when T's is empty. Where do these fall: milestone false on T vs true on the Task; a numeric 0 on T (est_in_mins, duration); sg_description "" vs null on T; duration on T vs a Task with only start_date, or only due_date, set?

Endpoint PUT /entity/shots/<id> ; PUT /entity/tasks/<id> ; POST /entity/tasks/_search

Docs claim Silent.

Setup Provisioned by the probe; no operator step. One template T with six tasks and no edges (no dependency cascade), one Shot created with T, each linked Task hand-edited, then task_template null, then T (recipe 015's re-apply). Every step read back. All rows deleted; the left-clean check found 0 Shots, templates, Tasks, template tasks and TaskDependency rows.

Actual

T as read back:  z milestone False, est 0, desc None ("" was written)
                 n dur 0, desc None, est None     c milestone True, est 300, desc T.c (control)
                 f dur 480 (control)   s dur 960   d dur 960
Task   before the re-apply                          after task_template null   after task_template T
z      milestone True, est 60, desc hand            unchanged                  milestone True, est 0, desc hand
n      dur 1920, est 60, desc hand, no dates        unchanged                  dur 0, est 60, desc hand
c      milestone False, est 60, desc hand           unchanged                  milestone True, est 300, desc T.c
f      dur 1920, no dates                           unchanged                  dur 480
s      start 2026-05-04, due None, dur None         unchanged                  unchanged
d      start None, due 2026-05-08, dur None         unchanged                  unchanged
every PUT -> 200; all six Tasks still linked to T's tasks throughout

Teaches

on T's task on the linked Task after the re-sync
milestone true (control) false overwritten: true
milestone false true kept: true. False is the checkbox's empty
est_in_mins 0 60 overwritten: 0
duration 0 1920, no dates overwritten: 0
duration 480 (control) 1920, no dates overwritten: 480 (102 agrees)
sg_description "" "hand" kept. The server stored "" as null on T's task, so "" and null are one case
sg_description null, est_in_mins null (negative control) a value kept (102 agrees)
duration 960 only start_date set, duration null kept: duration stays null, no date filled
duration 960 only due_date set, duration null kept: duration stays null, no date filled
  • 0 is a value, false is not. A numeric 0 on T's task wipes the Task's number; a false checkbox never clears a true one. A merge that means "leave it" must not store 0 on the template.
  • duration copies only onto a Task with no dates (here and in 102). Either date set, alone or with the other, keeps the Task's duration; with one date only, it stays null.
  • A text field cannot hold "" on a template task: the write is accepted and reads back null.
  • Not measured: "" on the linked Task side; sg_sort_order 0; a custom number or checkbox field; milestone false on T vs a Task with dates; duration 0 on T vs a dated Task.

Every entry on this site is the output of a probe in probes/. The corpus is generated by running those probes against a live Flow Production Tracking site, not written from memory.

Not affiliated with or endorsed by Autodesk. Flow Production Tracking is their product; this is an independent record of how its REST API answers.